Playgrounds across Portsmouth set for upgrades with new equipment

New swings, toddler equipment and an accessible carousel are planned for Portsmouth parks.

Several Portsmouth playgrounds are set for a makeover, with the city council investing in new equipment and making facilities more accessible for children.

Portsmouth City Council has set out plans to replace old play equipment and improve facilities for children at parks across the city.

Among the sites due to benefit are Victoria Park, College Park, Southsea Common and Wimbledon Park.

Proposed Southsea Common play areaplaceholder image
Proposed Southsea Common play area

Victoria Park is set to receive £100,000 to replace its existing play equipment. The work is currently in the procurement stage.

At College Park, £60,000 has been set aside to replace the existing play equipment, with the project also in procurement.

Southsea Common is due to receive £80,000 for new junior and toddler play equipment, while Wimbledon Park will get £60,000 for similar upgrades. Both projects are currently in procurement.

Milton Park is also set for new junior and toddler play equipment, with £80,000 allocated and work scheduled.

At Zetland Field, £40,000 will be spent replacing the existing equipment, while Little George Street will receive a £50,000 upgrade. Work on both schemes is yet to start.

Teignmouth Road, also known as Cobden, will receive £70,000 to replace its toddler and junior play equipment, with work due to start in January 2027.

The council is also carrying out improvements to make playgrounds more accessible for children with disabilities and additional needs. A total of £50,000 has been allocated to 12 sites across Portsmouth, with all the schemes currently under way.

At Queen Street, an existing roundabout will be removed and replaced with an accessible carousel.

New accessible swings will be installed at Prospect Lane and Central Street, replacing the existing swings.

At Kingston Recreational Ground, a new accessible swing will be installed in the existing swing area.

At Tamworth Field, a new path will improve access to basket and disabled swings. At Baffins Pond, the existing path will be replaced with a new surface to improve access to the swings.

Waterworks Field will get a new path linking the existing tarmac path to a new swing area, while the play area off Prince Albert Road in Southsea will receive a new path leading to its basket swing and new mulch surfacing.

Further access improvements are planned at Orchard Road, Alexandra Park and in Buckland.

The plans are part of a wider programme to replace older equipment and improve play areas across the city.

A council report said much of the equipment installed through previous investment programmes was now approaching the end of its working life.

The council has a long history of investing in its playgrounds. Major improvements were made through the Play 2000 programme, followed by the Play Pathfinder scheme in 2008, which received more than £2m in funding from the former Department for Children, Schools and Families.

More than 110 council play areas were assessed in 2022. The review found that 72 per cent of smaller local play areas, 69 per cent of neighbourhood play areas and 81 per cent of larger destination play areas were rated as providing good facilities.

The council now manages 120 play sites across Portsmouth and carries out regular inspections and maintenance.

News you can trust since 1877
Follow us
© 2026 Iconic Media Group Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice