The outdoor pool originally opened its doors back in 1935 by Portsmouth City Council but its condition significantly deteriorated over the years, making it unsafe to use.
Following multiple consultations, a multi-million pound project was launched last year to completely restore the pool to its former glory. The pool, which will open in the summer, will feature new changing rooms, new benches and tables, artwork, a fountain and, most importantly, a fully functioning outdoor swimming pool.
In the most recent updates, the pool has been completely concreted and the contractors are currently pumping water out of the pool that collected in there over Christmas.
Bright shower unit cabins have now been installed at the lido. They need to be plumbed in and have gas and electrical connections completed.
The plant room floor has been concreted, and work will start to reinforce the walls. Three filtration tanks will be installed in the plant room in due course.

113. Hilsea Lido - March 2025
Drone footage has captured the significant progress being made at Hilsea Lido. Picture: Marcin Jedrysiak | Marcin Jedrysiak

114. Hilsea Lido - March 2025
Marcin Jedrysiak has captured some astonishing drone footage of the multi-million pound work being completed at Hilsea Lido. | Marcin Jedrysiak

115. Hilsea Lido - February 2025
Soon a tent will be put up over the pool to protect it from the elements. The ground needs to be stable enough to take the weight. | PCC

116. Hilsea Lido - February 2025
This is a rubble pile the team are using to prepare the ground around the pool ready to be surfaced. | PCC

